Discount applied successfully

Buy custom Just in Time

Essay's paper info
Topic: Business
Number of pages / Number of words: 7 / 1800
Essay's paper body

JIT accounting systems are similar to process costing; the vehicle for collecting costs is the time in the system, not a work order.

There was a major need for this process because before the introduction of JIT, there were a lot of manufacturing defects for the existing system at that time. This included inventory problem, product defects, risen cost, and large lot production and delivery delays...


Essay fragment Read more

Need an Essay?

Choose one of the options below

Custom Written Essays

  • Order plagiarism free custom written essay
  • All essays are written from scratch by professional writers according to your instructions and delivered to your email on time. Prices start from $11.99 /page
Order Custom Paper

Full Access to Essays Database

  • This option gives you the immediate access to all 184 988 essays
  • You get access to all the essays and can view as many of them as you like for as little as $28.95/month
Buy Database Access

If at our website you can not find any essay you need for your study, you can order a paper on any topic with us.
Our company employs only qualified writers that are Master's and PhD holders.

Order custom written essay

Benefits
  • Research papers are written by professional writers
  • Requirements are always met
  • Posibility to control the working process of your paper
  • A chance of becoming the best student in your class.

This included inventory problem, product defects, risen cost, and large lot production and delivery delays. The inventory problems included the unused accumulated inventory that was not only unproductive, but also required a lot of effort in storing and managing them. Other implied problems such as parts storage, equipment breakdowns, and uneven production levels...


Essay fragment

General points of the essay

managerial work time and space: literature review Appraisal Systems: An Effective Tool or a Waste of Time Job Order Costing Just In Time Systems Just-in-Time Supply Chain Managment Systems and Chrysler Auto Time-phased project work and projecft cost control Transportation Costs and International Trade Over Time News Is it prime time or all the time? School, Work, And Time For Friends Time Management: Putting Time On Your Side report about real time systems' conferece Work And Study At The Same Time: Not Always A Good Choice Image Enhancement And Edge Detection For Real Time System Applications Real-Time Processing System The impact of Information Systems on business process design (or redesign), managerial roles, and the changing world of work

Essays related to the topic
Title Pages / Words Select
Activity Based Costing essay 4 / 942
Activity Based Costing essay 4 / 905
Job Order Costing essay 2 / 383
Lux Electronic, Inc essay 3 / 587
process coating essay 3 / 657
Absorption Costing essay 4 / 975
Information Age essay 3 / 786
Services